| Proposal | Details of external materials of construction of buildings & hard surfaced areas, photographic building recording report, Biodiversity Net Gain Plan, scheme of landscaping & tree planting, contamination of land or pollution of controlled waters, surface water disposal, foul water disposal, site & floor levels, prevent the deposit of mud on public highways by vehicles travelling from the site during construction, frontage footway extended North to make connection at the access, with a suitable pedestrian crossing points with tactile paving to make connection with the existing footway on the opposite side of Mill Drove South & external boxes for gas & electricity supplies & of any gas flues & soil vent pipes (Conditions 3, 7, 8, 9, 11, 13, 14, 15, 18, 21 & 22 of H01-0509-23) |