PLANNING APPLICATION DETAILS
| Reference | H16-1327-21 |
| Status | Approved |
| Proposal | Construction and operation of an unmanned Battery Energy Storage System ('BESS') with a power capacity of up to 550 megawatt ('MW') with associated works including control and protection systems, power conversion systems (and associated transformers), temperature regulation systems, a main step-up transformer(s) and switchgear, welfare facilities, electrical cabling and electrical connection, and other associated works. |
| Location | Land at Spalding Power Station West Marsh Road Spalding PE11 2BB |
| Parish | Spalding |
| Case Officer | Mark Simmonds |
| Received | 21-12-21 |
| Validated | 21-12-21 |
| Decision By | 15-06-23 |
| Decided | 14-06-23 |
| Applicant | Spalding Energy Park Ltd. 30 Crown Place Early Street London EC2A 4ES |
| Agent | DWD LLP 6 New Bridge Street London EC4V 6AB |