Proposal | Works to facilitate the Viking Link electrical interconnector with an approximate capacity of 1400 megawatts (MW) extending from Revsing, Jutland,
(Denmark) to Bicker Fen, Lincolnshire (UK) comprising:
- Installation of two (2) subsea high voltage direct current (DC) cables between Mean Low Water Springs (MLWS) and landfall at Boygrift in East Lindsey;
- Installation of two (2) onshore DC cables between the landfall at Boygrift and the converter station at North Ing Drove in South Holland;
- Construction of associated Temporary Construction Compounds (TCC) and Temporary Works Areas (TWA) and temporary vehicle access
arrangements required for DC and AC cable installation;
- Erection of converter station buildings together with the formation of internal roads, permanent access road from the A52, erection of security fencing,
formation of landscaping with associated temporary construction compounds;
- Installation of up to six (6) onshore high voltage alternating current (AC) cables between the converter station at North Ing Drove and the existing Bicker
Fen 400 kilovolt (400kV) Substation owned and operated by National Grid Electricity Transmission Plc (NGET);
- Installation of link pillars along the AC cable route for inspection and maintenance purposes, these will be contained within fenced areas;
- Installation of all associated drainage mitigation works; and
- Installation of fibre-optic cable(s) with the high voltage AC and DC cables |