PLANNING APPLICATION DETAILS
Reference | H16-1327-21 |
Status | Approved |
Proposal | Construction and operation of an unmanned Battery Energy Storage System ('BESS') with a power capacity of up to 550 megawatt ('MW') with associated works including control and protection systems, power conversion systems (and associated transformers), temperature regulation systems, a main step-up transformer(s) and switchgear, welfare facilities, electrical cabling and electrical connection, and other associated works. |
Location | Land at Spalding Power Station West Marsh Road Spalding PE11 2BB |
Parish | Spalding |
Case Officer | Mark Simmonds |
Received | 21-12-21 |
Validated | 21-12-21 |
Decision By | 15-06-23 |
Decided | 14-06-23 |
Applicant | Spalding Energy Park Ltd. 30 Crown Place Early Street London EC2A 4ES |
Agent | DWD LLP 6 New Bridge Street London EC4V 6AB |