PLANNING APPLICATION DETAILS
ReferenceH16-1327-21
StatusApproved     
ProposalConstruction and operation of an unmanned Battery Energy Storage System ('BESS') with a power capacity of up to 550 megawatt ('MW') with associated works including control and protection systems, power conversion systems (and associated transformers), temperature regulation systems, a main step-up transformer(s) and switchgear, welfare facilities, electrical cabling and electrical connection, and other associated works.
LocationLand at Spalding Power Station West Marsh Road Spalding PE11 2BB
ParishSpalding
Case OfficerMark Simmonds
Received21-12-21
Validated21-12-21
Decision By15-06-23
Decided14-06-23
ApplicantSpalding Energy Park Ltd. 30 Crown Place Early Street London EC2A 4ES
AgentDWD LLP 6 New Bridge Street London EC4V 6AB